A PROPOSED DESIGN OF A WATER DISTRIBUTION SYSTEM USING EPANET FORSERERE DISTRICT

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0152
  • Access Fee: ₦5,000 ($14)
  • Pages: 55 Pages
  • Format: Microsoft Word
  • Views: 245
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
INTRODUCTION PROJECT BACKGROUND  

globally and considering the hydraulic cycle, water is in constant motion from the land surface to the atmosphere and from atmosphere to the ground or land surface. run off is experienced when heavy rains are experienced. this run off normally erodes loads of silt sediments and this mixes with streams, lakes and pollutes surface water (chang 2004). in china due to industrialisation, the water cycle has been tempered with. this is due to production of toxic compounds like oxides of carbon and sulphur which react with water forming complex. there is massive deforestation which has led to reduction in transpiration. there is a general shortage of quality water globally due to increasing population and industrialisation

A PROPOSED DESIGN OF A WATER DISTRIBUTION SYSTEM USING EPANET FORSERERE DISTRICT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0152
  • Access Fee: ₦5,000 ($14)
  • Pages: 55 Pages
  • Format: Microsoft Word
  • Views: 245
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0152
    Fee ₦5,000 ($14)
    No of Pages 55 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Though water gives a lot of benefits to the local communities as various activities done by man need water such as washing, cooking, drinking, cooling machines, irrigation transportation, bathing and others. But man through deforestation along water sources, caused a great scarcity of this water. This study was conducted in December 2008... Continue Reading
    The study detennines the impact of design and implementation of a centralized dmg distribution in Busia district . the purpose of the study is to design dmg distribution inf01mation system for managing dmgs in Busia district. The study intended to establish and recommend strategies polices to reduce the safety of dmgs for the district this in view... Continue Reading
    ABSTRACT The study was to design a water supply system for Muko Ikamiiro parish in Rubanda district. The study was guided by the following objectives mainly to increase access to safe adequate and sustainable water, sanitation and hygiene service delivery. And specifically to characterize and determine the quality of the available water sources,... Continue Reading
    Abstract  The GSM Based Water Distribution Monitoring and Control System improves the water distribution by providing the automation of water levels in the tanks and monitoring and control of water flow in the distribution network. Water sensor detects the water level in the tanks and then sends signal to the microcontroller unit for actuation of... Continue Reading
     Generally, water has numerous purposes: drinking; bathing; washing clothes and dishes; cooking; flushing toilet, irrigation, just to name a few. Its significance cannot be over stressed. This is on the grounds that every day each individual uses water for one thing or the other. As water flows throughout the distribution system, microorganisms... Continue Reading
    CHAPTER ONE 1.1.0         INTRODUCTION 1.2.0         The advent of computers has brought better and remarkable changes in the socio-economical activities of society. Right from invention computer application has evolved from restricted scientific fields to almost every sphere of life as a result of a series of modifications and/or... Continue Reading
    ABSTRACT Billing is a critical function of most Water Boards especially towards sending the bill to their consumers. Most problems, currently seen, result from the manual processes followed. Calculation errors, delays in system updating and bill sending, also report tracking issues are the major problems that water boards find difficult to find... Continue Reading
    AIM AND OBJECTIVES The aim of the study is to improve the visual aesthetics of the whole environment at large and make the faculty more convenient for man through the provision of different facilities lacking in the area. OBJECTIVES The objectives are those principled processes we intend to follow so as to actualize our goal. (a) carrying out an... Continue Reading
                                                                                      ABSTRACT The two most common condenser tube problems faced by industrial users are internal tube fouling and tube failure. Fouling can have a major impact on the generating efficiency or the capacity of the condenser while the... Continue Reading
    ABSTRACT The two most common condenser tube problems faced by industrial users are internal tube fouling and tube failure. Fouling can have a major impact on the generating efficiency or the capacity of the condenser while the tube leaks or failure can seriously impact unit availability and reliability. Fundamental understanding of the root... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us