REFURBISHING OF A FIXED AND FLUIDIZED BED

  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0218
  • Access Fee: ₦5,000 ($14)
  • Pages: 34 Pages
  • Format: Microsoft Word
  • Views: 1.3K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT

The repair of the fixed bed adsorption column, a product of arm field technical company was carried out for the purpose of bringing the faulty equipment back to its normal operating system.
Before this exercise, the equipment was out of operation because of the completely blocked base of the fixed bed column (water column) and the malfunctioning of the air control value.
The sintered bronze plate which formed the base of the water column was cleaned up and freed from debris which originally blocked the porosity of the plate to an unacceptably level.  To do this, the plate was soaked in a diluted acetic acid and a current of air used to free the tiny openings from blockage.  Later, the air control valve where properly reactivated, rectified and recalibrated.
At the end the operation of the equipment came back to normal functioning.  The entire equipment was cleaned up and lubricated.
The fluidized bed was run and found to be in good order.

TABLE OF CONTENT
Title page
Letter of transmittal
Acknowledgement
Dedication
Abstract
Table of content

CHAPTER ONE
1.0  INTRODUCTION

CHAPTER TWO 
2.0   LITERATURE REVIEW
2.1   Absorption
2.2   Types of Absorption
2.2.1 Physical Absorption
2.2.2 Chemical Absorption
2.3    Absorbents 
2.4    Desorption
2.4.1 Desorption Methods
2.5    Desorption Operation
2.5.1 Stagewise Operation
2.5.2 Continuous Contact 
2.6    Analysis of Fixed – Bed Adsorption
2.7    Adsorption of Solute from Dilute Solution
2.8    The Process of Welding
2.8.1 Oxy-Acetylene Welding 

CHAPTER THREE
3.0    REFURBISHING PROCEDURE

CHAPTER FOUR
4.0   OPERATION OF THE EQUIPMENT

CHAPTER FIVE
5.0   Conclusion 

CHAPTER SIX
6.0   Recommendation 

REFURBISHING OF A FIXED AND FLUIDIZED BED
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0218
  • Access Fee: ₦5,000 ($14)
  • Pages: 34 Pages
  • Format: Microsoft Word
  • Views: 1.3K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Chemical Engineering
Project ID CNG0218
Fee ₦5,000 ($14)
No of Pages 34 Pages
Format Microsoft Word

Related Works

ABSTRACT The objective of the repair and refurbishing the pilot plant temperature control equipment is to keep the apparatus in good working condition for it to be used for its various purposes. The part of the temperature control changed and new one installed. This was due to series of faults developed by the former one” Electrical accessories... Continue Reading
ABSTRACT The objective of the repair and refurbishing the pilot plant temperature control equipment is to keep the apparatus in good working condition for it to be used for its various purposes. The part of the temperature control changed and new one installed. This was due to series of faults developed by the former one” Electrical accessories... Continue Reading
ABSTRACT This project is concerned write the identification of those defects that are found in most of the drawing tables in the Mechanical Engineering drawing studio. The report investigates the possible ways through which the mentioned above can be brought back to normal standard for usage... Continue Reading
ABSTRACT             This project is concerned write the identification of those defects that are found in most of the drawing tables in the Mechanical Engineering drawing studio.             The report investigates the possible ways through which the mentioned above can be brought back to normal standard for usage ins the... Continue Reading
The focus of this project was the development of an ICU/Rehabilitation adjustable bed for the hospital and home environment. The project was initiated with the desire to develop an innovative, effective and inexpensive mechanism that would require an electrical supply. The design was performed systematically using various methods, procedures,... Continue Reading
The focus of this project was the development of an ICU/Rehabilitation adjustable bed for the hospital and home environment. The project was initiated with the desire to develop an innovative, effective and inexpensive mechanism that would require an electrical supply. The design was performed systematically using various methods, procedures,... Continue Reading
ABSTRACT In this project, three alternative design solutions were considered for the foldable cam – bed. The authors utilize the local materials (with cost consideration) for the components. The merits and demerits of each of the alternative with respect to the considered group were also discusses and the... Continue Reading
ABSTRACT In this project, three alternative design solutions were considered for the foldable cam – bed. The authors utilize the local materials (with cost consideration) for the components. The merits and demerits of each of the alternative with respect to the considered group were also discusses and the solutions of the alternatives that best... Continue Reading
 ABSTRACT In this project, three alternative design solutions were considered for the foldable cam – bed. The authors utilize the local materials (with cost consideration) for the components. The merits and demerits of each of the alternative with respect to the considered group were also discusses and the solutions of the alternatives that... Continue Reading
ABSTRACT In this project, three (3) alternative design solutions were considered for the camp-bed. The authors utilize the local raw materials (with cost consideration) for the comments. The merits and demerits of each of the alternative with respect to the considered grip were also discussed and the solutions of the alternatives that best... Continue Reading
Call Us
whatsappWhatsApp Us