ABSTRACT
The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu.
The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equipment in the pilot plant, so that student would use it in understanding the nature of the flow of fluid through pipe lines, these process was also for the development of the knowledge of every one who carried out the operation.

The process involved in the refurbishment of the fluid flow demonstration unit were in stages and it started with the finding of faults, at this stage the equipment was operated to know where the possible fault would arise from, while water was passing through the cylindrical glass tube, it was not visible, which we noted was due to dirt’s cloged in the pipes internal surface.  The storage tank was filled with clean water, when this water was pumped out, it was dirty then we noted also the storage tank was dirty.  Some pipes were not held firmly to the board this was due to worn out clips, bolts and nuts, we also noticed leakages in some hose pipes.
Since the faults has been found we started servicing by first decoupling of the cylindrical glass tubes from the board one after the other with utmost care using screw drivers, spanners and pliers gradually all the tubes were removed from the board.  After dismantling these tubes, sulphuric acid {H2S04}, detergent, water and brush which would be used for washing the pipes were brought in place, the sulphric acid was passed through the pipe to soften the dirt’s in the pipe, then the detergent was dissolved in water, with brushes of different sizes all the pipe were washed and rinsed with clean water and allowed to dry.  After these a dry rag was soaked in detergent and water which was used in cleaning the board removing the stains and dirts from it, then it was allowed to dry.  The board was later painted with a white oil paint using a brush to coat it first and allowed to dry then finally painted.  The storage tank was also washed with detergent and water the allowed to dry, then it was painted with the aid of a brush both internally and externally.  Some bolts, nuts, chips and hosepipe that was leaking were replaced.
Finally the fluid flow demonstration unit was brought back in place for use, giving the unit along lasting use, enabling the use in the Chemical Engineering pilot plant.
 
TABLE OF CONTENT
Title page
Approval page
Dedication
Acknowledgement
Abstract
Table of content
Letter of transmittal

CHAPTER ONE:
INTRODUCTION

2.0 CHAPTER TWO
History of fluid flow
Fluid flow
Fluid flow in pipes
Fluid flow measurement
Equipment description

CHAPTER THREE: REFURBISHMENT PROCEDURES

CHAPTER FOUR: DISCUSSION

CHAPTER FIVE: CONDUSION AND RECOMMENDATION 

REFERENCES 

A PROJECT REPORT ON THE REFURISHMENT OF FLUID FLOW DEMONSTRATION UNIT

Share This

Details

Type Project
Department Chemical Engineering
Project ID CNG0317
Price ₦3,000 ($9)
No of Pages 48 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Chemical Engineering
    Project ID CNG0317
    Price ₦3,000 ($9)
    No of Pages 48 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu. The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equipment in the pilot plant, so that student... Continue Reading
    REPORT ON FABRICATION OF FLOW NOZZLE ABSTRACT The flow nozzle was constructed based on the dimensions and specifications of the international standard organization (I.S.O) recommendation. Throat diameter 42.5mm Length converging nozzle 68mm Thickness of nozzle 2mm Diameter of major axis of ellipse 85mm Diameter of minor axis of ellipse 56.6mm... Continue Reading
    ABSTRACT. This project is a very crucial study for the off – shore banks to establish a way of financing in Nigeria. In carrying out this research work I intended to determine the possibility of off – shore banking operation in Nigeria. Secondly, whether there... Continue Reading
    ABSTRACT. This project is a very crucial study for the off – shore banks to establish a way of financing in Nigeria. In carrying out this research work I intended to determine the possibility of off – shore banking operation in Nigeria. Secondly, whether there is enough multinational firms and corporation to carry out the function of off –... Continue Reading
    ABSTRACT This project topic, Teleconference System, is one of the state of the art invention and need of many organizations for purpose of reducing cost, risk and time wastage. This project strives to bridge the geographical distance between two or more organization. Other importance of Teleconference includes: (i) For organizations, delivery... Continue Reading
    ABSTRACT         The microcontroller smoke detector is a system designed to provide security level in areas that requires high accuracy of precaution against fire outbreak, in an industry, commercial buildings and even domestic homes.         This project uses 89s52 microproecessor as it major component. This microprocessor is the... Continue Reading
    ABSTRACT The construction of Sieve Industrial Sieve Compartment was carried out in the Engineering Workshop, Institute of Management and Technology, Enugu. The aim of this project is to fabricate an industrial sieve compartment which is capable of separating solid particles of... Continue Reading
    ABSTRACT Nowadays, the destruction and pollution of humane environment has produced an ever growing awareness worldwide of the need for more effective sedimentation processes. The main aim of this project was to design and fabricate an experimental sedimentation rig with the objective to determine the rate of settling against time using calcium... Continue Reading
    ABSTRACT Nowadays, the destruction and pollution of humane environment has produced an ever growing awareness worldwide of the need for more effective sedimentation processes. The main aim of this project was to design and fabricate an experimental sedimentation rig with the objective to determine the rate of settling against time using calcium... Continue Reading
    ABSTRACT Most Stock Marketing Report, production, and manufacturing firms have the basic problem of information flow between the various departments within the organization. This research is intended to highlight the role of a computerized Stock Marketing Report information system in NSEC Compare to the manual system of Stock Marketing Report. To... Continue Reading