+234 813 0686 500
+234 809 3423 853
info@grossarchive.com

THE CONSTRUCTION OF TWO FEET ELECTRONICS FLUORESCENT LAMP

  • Type:Project
  • Pages:30
  • Format:Microsoft Word
(Electrical Engineering Project Topics & Materials)
ABSTRACT 
Engineering being the mother every technology cannot be neglected. Without practical application in the field of engineering. The student and their tutors are impotent. The lucrative nature of engineering depends on the technical know-how of the engineer.
The purpose of practical project to students is to help them acquire practical knowledge in their choosing area of specification. It helps them to have a foretaste of the real world.
This report is a comprehensive report on the practices project I did. Precisely, with adequate knowledge and preparation, the student will celebrate victory from time to time.    

TABLE OF CONTENT
Title Page 
Dedication 
Acknowledgement
Preface 
Table of Content 
Abstract
CHAPTER ONE 
1.0INTRODUCTION

CHAPTER TWO 
2.0Literature Review
2.1Component Description
2.2Capacitor 
2.2.1Characteristic of Capacitors 
2.3Resistor 
2.4Transformer 
2.5Transistor 
2.6Diode 
  
CHAPTER THREE 
3.0Principle of Operation 
3.1Block Diagram 
3.2 Circuit Diagram 
3.3Wiring Diagram 

CHAPTER FOUR 
4.0CONSTRUCTION 
4.1How the Construction was Made 
4.2Construction of the Chassis (Casing)   
4.3Flat Pattern Drawing of the Chassis 
4.4Tools used During Construction  

CHAPTER FIVE
5.0TESTING & RESULT  

CHAPTER SIX 
6.0RECOMMENDATION AND CONCLUSION 
6.1Recommendation 
6.2Conclusion 
6.3Reference 

THE CONSTRUCTION OF TWO FEET ELECTRONICS FLUORESCENT LAMP

Share This

Details

Type Project
Department Electrical Engineering
Project ID ELE0156
Price ₦3,000 ($9)
No of Pages 30 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0156
    Price ₦3,000 ($9)
    No of Pages 30 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Man has been so used to electricity that he cannot do without it. The absence of electricity causes a lot of sadness in our daily lives. Due to this reason I decided to work on a by rechargeable lamp as my project. The project is to see how one can construct a source of high without really generating is from an A.C source. I decided to... Continue Reading
    ABSTRACT Researchable lamp is a source of light that is generated from a D.C sources of supply this D.C sources is a battery that can also way be charged when it current and voltage ruse I decided to work on this as my project because its importance. It is very portable and help the a lot during night reading It also serves as an immanency sources... Continue Reading
    ABSTRACT For a long time, the department of Electrical/Electronic of this college has not had a website with guaranteed continuity. Several students in past had made attempts to achieve this but all to no avail. Eventually, with the implementation of this project,the department... Continue Reading
    ABSTRACT For a long time, the department of Electrical/Electronic of this college has not had a website with guaranteed continuity. Several students in past had made attempts to achieve this but all to no avail. Eventually, with the implementation of this project,the department now has a functional website. The Website User Interface is designed... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    ABSTRACT The role of internal auditors in construction companies cannot be overemphasized. This research work is aimed at assessing the role of internal auditors in a construction companies in Kaduna State. The sample size is Nalado Construction Company, Kaduna. Both primary and secondary methods were used to collect data, for the primary sources,... Continue Reading
    ABSTRACT This research work tends to explain the prospects of human resource management in enhancing higher productivity and also explain the human resource objective policies and importance of human resource management as in whole of adequate utilization of people or staff in organization towards enhancing higher productivity, while on the other... Continue Reading
    ABSTRACT This study was aimed primarily at highlighting the techniques, policies and concept of auditing as they relate to growth of Business Corporation. The principal focus was on the private sector which more than any other sector... Continue Reading
    ABSTRACT The project was on the construction of a venturimeter. Venturimeter being a measuring instruction was used in determining the flow rate of fluid down a pipe or the rate of discharge in a pipeline and is often fixed permanently at different sections of the piple line to know the discharge there. The research... Continue Reading
    ABSTRACT This project work is on the construction of an F.M transmitter this system consists of four discrete modules namely the audio frequency (AF) amplifier (class A) the modulator the master oscillator and the radio frequency (RF) amplifier (ClassC) these formed the conventional events for building FM transmitter here the signal (from the... Continue Reading