ABSTRACT

The Turbine Mixer was Fabricated at the ________________________
The method of the fabrication of the Turbine Mixer involves a preliminary computation of the dimensions of the standard Turbine in relation to the dimension  of the reacting vessel in which they will be used in. making out, cutting out to sizes, rolling/folding, welding, body filling, glass- papering and painting. The total surface area is 10741.5cm2
The first step taken in the fabrication of the said project was the selection of the material suitable for the construction.
The material used in the construction were locally sourced and were selected to suit the desired purpose. The mild steel was used instead of galvanized steel due to its relative low cost. The mild steel; was coated with point to prevent corrosion attack and determination of the work.
The dimension of the project were as follow 31.0cm for the height and 21.0cm for the diameter. The volume capacity of the cylinder is 10,7415cm3. the average speed of the turbine mixer is 125pm. The turbine mixer is manually operated a design that is meant to save cost.
 
TABLE OF CONTENT

Title page
Letter of Transmittal
Approval page
Dedication
Acknowledgement
Abstract
Table of content

CHAPTER ONE
1.0Introduction
2.1 Objectives / Scope of the project

CHAPTER TWO
2.0 Literature Review
2.1 Agitation and mixing
2.2 Liquid – liquid Agitation
2.3 Purpose of agitation
2.4 Types of mixer/mixing equipment
2.4.1 Types of impeller for liquid. Impeller selection
2.5 Application of impeller
2.6 Shaft
2.7 Baffles
2.8 Circulation rates
2.9 Mixers for plastic solids and pastes 
2.10 Mixers for dry light solids (powder)
2.11 Materials of Construction.

CHAPTER THREE
3.0 Fabrication / modification procedure
3.1 Steps of fabrication process
3.2 Cost Analysis

CHAPTER FOUR
4.0 Discussion
4.1 Conclusion
4.2 Recommendation
4.3 References
4.4 Nomenclature.





CONSTRUCTION OF TURBINE MIXER

Share This

Details

Type Project
Department Chemical Engineering
Project ID CNG0194
Price ₦3,000 ($9)
No of Pages 39 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Chemical Engineering
    Project ID CNG0194
    Price ₦3,000 ($9)
    No of Pages 39 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The fabrication of the pilot motorized mixer in volved a preliminary computation of the durunsions of the galvanized steel used, marketing out cutting out to sizes folding, welding, assembling and painting. The dimensions of the motorized mixer are as follows: The vessel is of 300min in diameter and 450mm... Continue Reading
    ABSTRACT Industrial mixer is equipment designed to carryout operation involved the combination of two or more substance to achieve a uniform product. The method of fabrication of this mixer involves a preliminary computation of the dimensions of the standard which they will be used in marketing out cutting, out to... Continue Reading
    ABSTRACT A paint mixer is defined as a pattern constructed for the production (mixing) of paint manually. The method of fabrication of the paint mixer involved a preliminary computation of the dimensions of the standard mixer in relation to the dimension of the reacting vessel in which they will be used in marking out, cutting out to sizes,... Continue Reading
    ABSTRACT A motorized mixer of 200 liters capacity was constructed to have the capability of mixing 200 liters of fluid during operation. The construction of the mixer involves the preliminary measures and calculations on the surface area of the metal sheet. Some basic workshop practices was carried out during the construction such as the marking... Continue Reading
    CONSTRUCTION OF A PILOT MOTORISED MIXER A REPORT PRESENTED TO THE DEPARTMENT OF CHEMICAL ENGINEERING OF THE INSTITUTE OF MANAGEMENT AND TECHNOLOGY, ENUGU ABSTRACT A motorized mixer of 200 liters capacity was constructed to have the capability of mixing 200 liters of fluid during operation. The construction of the mixer involves the preliminary... Continue Reading
    ABSTRACT Thermal electrical power generation is one of the major methods used in Egbin thermal station. Due to inconsistency and failure in the power supply in Nigeria, there is a need for a proper operation and maintenance schedule strategy of the various kinds of power plants accessories so as to facilitate their efficiencies and functionality.... Continue Reading
    In this study of designing a wind turbine using wind energy potential, a case of FUTA. Weibull distribution function method was adopt with the help of probability density function and cumulative density function analysis, the wind speed characteristics and energy potential of the study area was investigated using hourly wind speed data that span... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    ABSTRACT The role of internal auditors in construction companies cannot be overemphasized. This research work is aimed at assessing the role of internal auditors in a construction companies in Kaduna State. The sample size is Nalado Construction Company, Kaduna. Both primary and secondary methods were used to collect data, for the primary sources,... Continue Reading