Project Request: DESING AND CONSTRUCTION OF A HORIZONTAL WATER TUBE BOILER

More Details
Department: MECHANICAL ENGINEERING
Level :
Status: APPROVED
Delivery :Soft Copy

Related Works

ABSTRACT The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu. The boiler contains 2 steam tubes at triangular pitch which are enclosed in a shell. Water is... Continue Reading
ABSTRACT The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu.The boiler contains 2 steam tubes at triangular pitch which are enclosed in a shell. Water is introduced... Continue Reading
ABSTRACT Majority of farmers in Nigeria harvest a large proportion of maize under conditions of high humidity, and sadly enough, they lack equipment for drying the grains. The farmers store the grains at conditions of high moisture and humidity which results in growth of organisms that cause deterioration. One of the most important operations... Continue Reading
ABSTRACT  Majority of farmers in Nigeria harvest a large proportion of maize under conditions of high  humidity, and sadly enough, they lack equipment for drying the grains. The farmers store the  grains at conditions of high moisture and humidity which results in growth of organisms that  cause deterioration. One of the most important... Continue Reading
Resistivity methods used in horizontal and vertical discontinuities in the electrical properties of the ground water detection (Geology ) Chapter One: Introduction The resistivity method is used in the study of the horizontal and vertical discontinuities in the electrical properties of the ground and also in the detection of three dimensional... Continue Reading
ABSTRACT The aim of this project was to construct shell and tube heat exchanger with fixed boundless. A heat exchanger that would cool 5 x 5 x 10 – 3 kg/s of steam at a calculated heat load of 152 – 395/S was fabricated. The steam is to reach the heat exchanger from a distillation column at a temperature of 300k. The specification of... Continue Reading
ABSTRACT The aim of this project was to construct shell and tube heat exchanger with fixed boundless. A heat exchanger that would cool 5 x 5 x 10 – 3 kg/s of steam at a calculated heat load of 152 – 395/S was fabricated. The steam is to reach the heat exchanger from a distillation column at a temperature of 300k. The specification of... Continue Reading
ABSTRACT The precise content of this project was to construct a model shell and tube heat exchanger. The material for construction of this project (equipment) and their dimensions are as follows: 1. 500mm length of a tube bundle 2. 20mm diameter of the tube bundle 3. 650mm length of the shell 4. 120mm diameter of the shell 5. 70mm length of the... Continue Reading
ABSTRACT The precise content of this project was to construct a model shell and tube heat  exchanger.  The material for construction of this project (equipment) and their dimensions are as follows:  1.500mm length of a tube bundle  2.20mm diameter of the tube bundle  3.650mm length of the shell  4.120mm diameter of the shell  5.70mm length... Continue Reading
ABSTRACT The precise content of this project was to construct a model shell and tube heat exchanger. The material for construction of this project (equipment) and their dimensions are as follows: 500mm length of a tube bundle 20mm diameter of the tube bundle 650mm length of the shell 120mm... Continue Reading
ABSTRACT This project emphasis on the Automation of Auditing System acquainting its readers most especially the Internal Audit Sector. The basic objective of this project is to exhume the problems encountered during Auditing. When a statement of Account is... Continue Reading
CONSTRUCTION OF HEAT EXCHANGER FABRICATION OF A TUBE AND SHELL HEAT EXCHANGER SYSTEM ABSTRACT There are two methods of constructing heat exchangers: Plate type. Parallel flow-the hot fluid and the coolant flow in the same direction. Counter flow:- The hot fluid and the coolant flow in opposite direction. Cross flow: The hot fluid and the coolant... Continue Reading
ABSTRACT One of the major challenges in reservoir engineering is the accurate description of the reservoir. This description is essential in all aspects of petroleum engineering, and is typically achieved through reservoir characterization by integrating various kinds of information obtained from the reservoir. One reliable source of reservoir... Continue Reading
This project contains details of Coal fired circulating fluidize boiler.The motivation of our project was to develop a method which is energy economical i.e. uses less energy owing to increasing energy issues. Process description, mass balance, energy balance, equipment design, and cost estimation of circulating fluidized bed boiler for combustion... Continue Reading
TABLE OF CONTENTS TITLE PAGE...........................................................................................................I CERTIFICATION.......................................................................................II DEDICATION... Continue Reading
This project contains details of Coal fired circulating fluidize boiler.The motivation of our project was to develop a method which is energy economical i.e. uses less energy owing to increasing energy issues. Process description, mass balance, energy balance, equipment design, and cost estimation of circulating fluidized bed boiler for combustion... Continue Reading
ABSTRACT In the construct of 2,000 litres capacity water reservoir galvanized steel sheet forms the tank and an angle iron rod forms the stand. Two full length galvanized sheet were marked out and cut out to the required sizes. The work stated by cutting the it gauges galvanized steel sheets of full length into geometrical dimensions of the... Continue Reading
ABSTRACT In the construct of 2,000 litres capacity water reservoir galvanized steel sheet forms the tank and an angle iron rod forms the stand. Two full length galvanized sheet were marked out and cut out to the required sizes. The work stated by cutting the it gauges galvanized steel sheets... Continue Reading
CHAPTER ONE 1.0 INTRODUCTION 1.1 Statement of the Problems 1.2 Objectives of the Study 1.3 Scope & Limitations of the study 1.4 Specifications the following abbreviations are used CHAPTER TWO LITERATURE REVIEW CHAPTER THREE MATERIALS AND METHOD CHAPTER FOUR DESIGN AND IMPLEMENTATION CHAPTER FIVE SUMMARY, CONCLUSION AND RECOMMENDATION... Continue Reading
CHAPTER ONE 1.0 INTRODUCTION 1.1 Statement of the Problems 1.2 Objectives of the Study 1.3 Scope & Limitations of the study 1.4 Specifications the following abbreviations are used CHAPTER TWO LITERATURE REVIEW CHAPTER THREE MATERIALS AND METHOD CHAPTER FOUR DESIGN AND IMPLEMENTATION CHAPTER FIVE SUMMARY, CONCLUSION AND RECOMMENDATION... Continue Reading
whatsappWhatsApp Us