+234 813 0686 500
+234 809 3423 853
info@grossarchive.com

FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS IN NORTHERN NIGERIA

  • Type:Project
  • Chapters:5
  • Pages:65
  • Format:Microsoft Word
(Quantity Surveying Project Topics & Materials)
ABSTRACT
Several researches have been carried out in order to develop frameworks for determining performance of construction projects which were mostly based on Traditional criteria (i.e. cost, time and quality) only. And researches have highly criticized the use of traditional criteria only while determining construction project performance due to its inadequacy. However, literature has never developed framework for determining performance of Construction Projects using the emerging/non-traditional criteria since they also influence performance. This study developed a framework using the emerging construction projects performance criteria in the Northern Nigeria which was achieved through the following objectives; the identification of emerging criteria for determining performance of construction projects, assessment of the level of importance of the emerging criteria and development of framework for determining performance of construction projects using the emerging criteria. A total of 285 questionnaires were distributed to some construction industry stakeholders (i.e. Consultants, Contractors, Clients and End-users) were asked to assess the level of importance of the emerging criteria. A total of 147 valid questionnaires were retrieved which represents 51.58% of valid response rate and subsequently analysed using descriptive analysis with the aid of Statistical Package for Social Sciences (SPSS) software. The most important criteria ranked by the respondents are; client satisfaction on outcome, effective risk management, client satisfaction on cost, client satisfaction on time etc. Most important criteria ranked by respondents are client oriented base. Using the emerging criteria for determining performance of construction projects as ranked by respondents in descending of priority will help the parties of the construction industry to understand how important those criteria are. Furthermore, it was also found that most important criteria as key areas of activity which favorable results are absolutely necessary for a goal to be achieved. Additionally, using the framework developed in this study for determining performance of construction projects will help in the monitoring of performance and redirect organisational action when necessary. Lastly, it can also help the contractors’ and other key stakeholders of the construction industry particularly the clients and consultants to monitor and evaluate projects more accurately towards achieving project objectives.





CHAPTER ONE
INTRODUCTION
1.1              Background to the study
The construction industry is dynamic in nature due to the increasing uncertainties in technology, budgets, and development processes (Chan, Scott and Ada, 2004). They further reported that, building projects are becoming much more complex and difficult, and facing unprecedented changes. Those uncertainties, along with many other documented problems, are the root causes of project delays and decline in construction projects performance (Ofori, 1991; Ogunlana, Promkuntong and Jearkirm, 1996).
The improvement of performance has become more critical to the success of construction projects which have been the subject of considerable amount of research and attention over the past two decades (Al-Otaibi, Omani and Price, 2013).
Studies have shown decline in construction projects performance both locally and internationally (Ogunlana, Li and Sukhera, 2003; Komolafe, Kingsley and Muhammad, 2014).
A number of authors have worked significantly on ways to improve performance from the view point of traditional criteria (i.e. cost, time and quality) (Neely et al., 1994; Idrus and Sodangi, 2010; Barkley and Saylor, 1994). Furthermore, in response to the decline of projects performance, several studies have developed and advocated the use of frameworks for assessing construction projects with a view to improve their performance (Cocca and Alberti, 2009; Kagioglou, Cooper and Ghassan, 2001; Belassi and Tukel, 2006). But the frameworks developed by several researches were mostly based on the traditional criteria that have been highly criticized (Paul, 2014). 
FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS IN NORTHERN NIGERIA

Share This

Details

Type Project
Department Quantity Surveying
Project ID QUS0013
Price ₦3,000 ($20)
Chapters 5 Chapters
No of Pages 65 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Quantity Surveying
    Project ID QUS0013
    Price ₦3,000 ($20)
    Chapters 5 Chapters
    No of Pages 65 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT Several studies on construction craft skills have identified a number of problems including ineffective training as responsible for shortages of craftsmen in the construction industry. In Nigeria, the problem of training craftsmen has been attributed to lack of a harmonised training framework. This research therefore examined existing... Continue Reading
        TABLE OF CONTENTS Cover Page – – – – – – – – – – Title Page – – – – – – – – – – Certification – – – – – – – – – – Dedication – – – – – – – – – – Acknowledgement – – – – – – – – –... Continue Reading
    THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA   (A CASE STUDY OF ENUGU STATE) ABSTRACT  This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and... Continue Reading
    THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE) ABSTRACT This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project.  Time factors are inherent... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contract. Fu and Drew (2002) suggest that competitive tendering is the most common method used for contractor selection. In competitive tendering process, a... Continue Reading
    Background of the Study: Every construction company all over the world expects not only to break even in every project undertaken, but to also make a reasonable level of profit that will satisfy the owners of the company. This is only possible if the activities involved in undertaking any particular project are optimized, viz-á-viz the factors of... Continue Reading
    ABSTRACT In the public procurement system in Nigeria has over the years been abused leading to cost inflation, delay in project delivery, poor quality of work, and project abandonment. The aim of this study is to examine the impact of the due process policy on construction projects delivery in Nigeria. Data were collected using a structured... Continue Reading
    ABSTRACT Variation is one of the most severe problems in the construction industry. This variation occurs in every construction project and the magnitude of these variations varies considerably from project to project. As such, the client had to spend more than what was initially estimated in most cases, sometimes, disputes and unnecessary delays... Continue Reading