EVALUATION OF INCENTIVE SCHEMES ON LABOUR PRODUCTION IN NIGERIA CONSTRUCTION INDUSTRY

  • Type: Project
  • Department: Building
  • Project ID: BLD0026
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CHAPTER ONE

INTRODUCTION

1.1  Relevance of project

1.2  Site inspection

1.3  Evolution of road network in nigeria

1.4  Motor vehicle characteristic that affects road design data

1.5  Drivers and their characteristics

1.6  Reconnaissance survey

1.6.1Chain survey

1.6.2Station marking

1.7  Factors Affecting Choice Of Station

CHAPTER TWO

THEODOLITE TRANSVERSING OF THE ROAD CONTROL

2.1  Definitions

2.2  Thetheodolite

2.3  Theodorite adjustment

2.3.1Temporary adjustment

2.3.2Permanent adjustment

2.4  Procedure for theodolite traversing

2.5Materials used for the theodolte traversinging

CHAPTER THREE

PROJECT FIELD LEVELING WORK

3.1  Leveling

3.2  Profile leveling

3.3  Cross leveling

3.4  Objectives of leveling

3.5  Instruments used in leveling

3.6  Temporary adjustment of leveling instrument

3.7  Definition of some leveling terminologies

3.8  Leveling book

3.9  Earthwork computation

3.9.1Method

CHAPTER FOUR

SOIL ANALYSIS

4.1  Collection and preliminary preparation of samples

4.2  Mechanical analysis

4.3  Atterberg/consistency limit tests

4.3.1Liquid limit test

4.3.2Plastic limit test

4.4  Compaction test

4.5  The California bearing ratio (cbr) test

4.6  Pavement design using cbr

CHAPTER FIVE

GEOMETRIC ELEMENTS DESIGN

5.1  Basic design parameters

5.1.1Design speed

5.1.2Gradient

5.1.3Sight distance

5.2  Curve design

5.3  Curve parameters and formula used, in designing of horizontal curves

5.4  Vertical curve design

5.5  Cross sectional elements of the road

5.6  Brief description on stages of work and equipment used n road constriction

5.7  Summary and conclusion

EVALUATION OF INCENTIVE SCHEMES ON LABOUR PRODUCTION IN NIGERIA CONSTRUCTION INDUSTRY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Building
  • Project ID: BLD0026
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Building
    Project ID BLD0026
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Choice Of Station CHAPTER TWO... Continue Reading
    ABSTRACT Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
    ABSTRACT  Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
    ABSTRACT   Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
    INTRODUCTION BACKGROUND OF THE STUDY      The administration of staff incentive scheme has now become a popular phenomenon of the total personnel policy of nay organization. The scheme involves those extra benefits which may not necessarily be money, which emanate from the kind relationship of the employer to the employees, to supplement their... Continue Reading
    INTRODUCTION The administration of staff incentive scheme has now become a popular phenomenon of the total personnel policy of nay organization. The scheme involves those extra benefits which may not necessarily be money, which emanate from the kind relationship of the employer to the employees, to supplement their usual wages, from the to time... Continue Reading
    INTRODUCTION The administration of staff incentive scheme has now become a popular phenomenon of the total personnel policy of nay organization. The scheme involves those extra benefits which may not necessarily be money, which emanate from the kind relationship of the employer to the employees, to supplement their usual wages, from the to time... Continue Reading
    THE EFFECT OF MOTIVATION OF LABOUR COST AND PRODUCTIVITY ON NIGERIA CONSTRUCTION INDUSTRY ABSTRACT Motivation is considered as an important tool for enhancing worker’ productivity. Construction sector is not an exception. It has been empirically established that motivation has positive impact on construction worker’s productivity. Moreover,... Continue Reading
    TABLE CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey... Continue Reading
    CHAPTER ONE 1.1      BACKGROUND OF THE STUDY For any industry operate successfully there is need for it to be knowledgeable in the field of production, what it intends to achieve models, process, areas of application in production. This project looks into two different aspects of production i.e production scheduling and control. Production... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us