+234 813 0686 500
+234 809 3423 853
info@grossarchive.com

PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY

  • Type:Project
  • Chapters:5
  • Pages:50
  • Format:Microsoft Word
(Building Project Topics & Materials)

CHAPTER ONE:
1.0 INTRODUCTION

1.1 Background of the study
1.2 Statement of the problem
1.3 Statement of the objectives
1.4 Research questions
1.5 Research hypotheses
1.6 Significance of the study
1.7 Scope of the study
1.8 Limitations of the study
1.9 Definition of terms

CHAPTER TWO:
2.0 REVIEW OF RELATED LITERATURE

2.1 Concept of internal control
2.2 Factors that characterize effective internal control
2.3 Classes of internal control
2.4 Limitations of internal control
2.5 Evaluations of internal control
2.6 Internal control and the auditor
2.7 Public accountability
2.8 Historical overview of the case study
2.9 Internal control and accountability

CHAPTER THREE:
3.0 RESEARCH METHODOLOGY

3.1 Research design
3.2 Sources of data
3.3 Area of study
3.4 Population of the study
3.5 Determination of sample size
3.6 Reliability of the instrument
3.7 Validity of the instrument
3.8 Method of data analysis

CHAPTER FOUR:
4.0 PRESENTATION OF DATA

4.1 Presentation of data
4.2 Test of hypotheses

CHAPTER FIVE:
5.0 SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS

5.1 Summary of findings
5.2 Conclusions
5.3 Recommendations
Bibliography
Appendices

PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY

Share This

Details

Type Project
Department Building
Project ID BLD0022
Price ₦3,000 ($20)
Chapters 5 Chapters
No of Pages 50 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Building
    Project ID BLD0022
    Price ₦3,000 ($20)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
    ABSTRACT Tracking system has been used since 1985, linking seemingly unrelated violent crime investigations and helping state and local law enforcement solve cases. This powerful and easy to use electronic case management software is designed to assist investigators in managing files from initial incident to court disclosure. The software features... Continue Reading
    Abstract Recent researches have indicated that formal material management programs have the potential to yield significant organizational cost savings, yet small‐ and medium‐sized organizations may not feel that an integrated material management program is cost effective. The objective of this study is to assess the impact of material... Continue Reading
      INTRODUCTION 1.1 BACKGROUND OF THE STUDY It is believed that one of the prevailing problems of construction industry in Nigeria is the impact of delays in project delivery. It is very important for both public and private projects to be completed on time and within budgets. Normally, achieving the projects within predetermined time, budget and... Continue Reading
    ABSTRACT This research project examined the impact of budgeting and budgetary control in construction project delivery in Nigeria. The study tried to find out how industries make budget and uses budget to achieve the objectives of the firm. It also sought to... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the construction industry to national... Continue Reading
    ABSTRACT This study identified the impact of economic recession on public project delivery Ekiti state,Nigeria. Economic recession is a barrier to the completion of a project delivery. Thisisacommonissueencounteredin the construction industry across the globe most especially in the developing countries. Ekiti-State,more than15% of construction... Continue Reading
    (A case study of Some Selected project Supervisors from Julius Berger Nigeria Plc and Marlum Nigeria Plc, Uyo offices.) CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because... Continue Reading
    COOPERATIVE SOCIETIES AND THE ACTUALIZATION OF THE FADAMA III PROJECT (A CASE STUDY OF THE THIRD NATIONAL FADAMA DEVELOPMENT PROJECT IN ENUGU STATE) ABSTRACT In this five chapter research work, an exposé is carried out on the role of cooperative societies in ensuring the success of the FADAMA III project. Chapter one presents an introduction to... Continue Reading
    ABSTRACT In this five chapter research work, an exposé is carried out on the role of cooperative societies in ensuring the success of the FADAMA III project. Chapter one presents an introduction to the research while chapter two consists of a review of related literatures, in which subject matters such as the scope, benefits and implementation... Continue Reading