FACTORS AFFECTING WORKERS PRODUCTIVITY IN BUILDING PRODUCTION PROCESS

  • Type: Project
  • Department: Building
  • Project ID: BLD0020
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CHAPTER ONE:
1.0 INTRODUCTION

1.1 Background of the study
1.2 Statement of the problem
1.3 Statement of the objectives
1.4 Research questions
1.5 Research hypotheses
1.6 Significance of the study
1.7 Scope of the study
1.8 Limitations of the study
1.9 Definition of terms

CHAPTER TWO:
2.0 REVIEW OF RELATED LITERATURE

2.1 Concept of internal control
2.2 Factors that characterize effective internal control
2.3 Classes of internal control
2.4 Limitations of internal control
2.5 Evaluations of internal control
2.6 Internal control and the auditor
2.7 Public accountability
2.8 Historical overview of the case study
2.9 Internal control and accountability

CHAPTER THREE:
3.0 RESEARCH METHODOLOGY

3.1 Research design
3.2 Sources of data
3.3 Area of study
3.4 Population of the study
3.5 Determination of sample size
3.6 Reliability of the instrument
3.7 Validity of the instrument
3.8 Method of data analysis

CHAPTER FOUR:
4.0 PRESENTATION OF DATA

4.1 Presentation of data
4.2 Test of hypotheses

CHAPTER FIVE:
5.0 SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS

5.1 Summary of findings
5.2 Conclusions
5.3 Recommendations
Bibliography

FACTORS AFFECTING WORKERS PRODUCTIVITY IN BUILDING PRODUCTION PROCESS
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Building
  • Project ID: BLD0020
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Building
    Project ID BLD0020
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control... Continue Reading
      ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
    Abstract The main aim of this study is to identify the significant factors for contractor selection in Nigeria using factor analysis. The study was also to find the preferred criteria for evaluation and selection of contractors in Nigeria. The selection of the most appropriate... Continue Reading
    ABSTRACT The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency... Continue Reading
    ABSTRACT The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency... Continue Reading
    ABSTRACT This study was set out to establish the relationship between staff quality and workers productivity in selected private building companies in Ali-sabih district, Djibouti the study wanted to establish the following: to determine the level of staff quality in selected private building companies, to determine the level of workers... Continue Reading
    ABSTRACT This projects is aimed at knowing the process and quality factor in Laundary and Toilet Soap Projection. Various factors affected the quality of the soap produced. These include the method used in production, types and nature of oils used, the percentage of the additives... Continue Reading
    ABSTRACT This project work was designed to examine and analyze the factors affecting the processing production and storage of garri in Oredo Local Government Area of Edo State. Five research questions were formulated and questionnaires were administered to hundred respondents in Oredo to determine the result for the study. At the end of the study,... Continue Reading
    ABSTRACT The main aim of the study was to assess the factors that affect goat production. The study was concerned with the analysis of socio-economic factors affecting goat production; with special reference to Zhombe district. Zhombe is a communal settlement area that that is found in the midlands province of Zimbabwe. It consists of 31 wards but... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The issue of low productivity of Nigeria workers has in recent years been a matter of greater concern to the nation. The rate of productivity grows are influenced by two things; viz (i) The rate of society’s demand and... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us