+234 813 0686 500
+234 809 3423 853
info@grossarchive.com

STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN NIGERIAN CONSTRUCTION SITES

  • Type:Project
  • Chapters:5
  • Pages:50
  • Format:Microsoft Word
(Building Project Topics & Materials)

ABSTRACT 

Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that this research work attempt to study the factors that are responsible, so as to identify them and proffer possible  ways of tackling the menace. The study attempt this through chosen  construction practitioners as population and samples were drawn  to this effect at random from the category of professionals, using probability sampling methods. The Data were collected from primary source consisting of structured questionnaire designed in Likert Scale in rating Scale of 1 to 5, while the Secondary Data were collected through review of Journal articles and relevant Text books. The Data were analysed using Severity Index, Ranking and Simple Percentages. It was discovered from the analysis that factors such as Contractors inexperience, inadequate planning, Inflation, incessant variation order, and change in project design were critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are also responsible. The study concluded with recommending, adequate planning using conventional techniques, Studying and applying project history, material bulk purchase, proper project design and establishing proactive fraud prevention system on sites, as panacea for effective cost performance on sites.

KEY WORDS: Performance, Cost, Construction, Factors.

INTRODUCTION

Construction industry in Nigeria had been a major source of employment for 70% of labour force in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of   project works; it determines to a large extent   the overall success of project works. So also if the resources are adequately harnessed, issues that pertains to cost overrun would not arise which could result to variations and claims. Some firms rely on claim as a result of variation incurred during the course of the project execution and afterward evaluate their profit after incurring necessary and unnecessary cost on a project.                                                 This however has tendency of positioning such in a disadvantageous profit position. An effective cost management strategy is therefore necessary, this could be achieved  through putting in place a proactive cost management strategy. (Love et al, 2005; Ogunsemi and Jagboro, 2005; Ferry et al, 1998).

They described cost management system as a process that should be carried out throughout the life cycle of a project, from the inception to final completion and final payment to the contractor. In the light of this, the timeliness and cost effectiveness of various operation and decision carried out will determine to an extent the magnitude of cost that could be saved on the project. ( Kerzner, 2005; Ogunsemi and Jagboro, 2005).

However Dissanayaka and Kumaraswamy,(1999) opined that Time, Cost, Quality target as well  as project satisfaction tend to be most important key to measure the overall performance of a project work. Furthermore, various research works have also indicated that most project records cost or time overrun during their tenure of execution.( Odusami and Olusanya, 2000).  (Mbachu and Olaoye, 1989; Madewsley, et al, 2004); opined that 51percent of average delay were experienced yearly which culminates in cost overrun, certain factors are responsible for this, to this end however this study attempts at investigating such factors and proffer solution to the pandemic.  The scope of this research work shall be limited to building construction sites within the selected area in Nigeria, Ogun state, Lagos state and Northern part of Nigeria. This is attributable to unique project environment they possess. The aim and objectives of the research are as follows: The research work is to determine the various factors that interplay in impacting project cost performance, investigating the order of severity of the factors, and recommending ways of curtailing the effects. Field survey was carried out with 100 questionnaire distributed  and 67 were used for analysis of response from construction practitioners selected randomly from population of construction firms, The primary data were collected with the aid of structured questionnaire designed on Likert Scale of 1to 4 rating scale.  Mean item score, Simple percentages and severity index were used as analytical tool of the generated data. SPSS (Statistical Packages for Social Science Students) was used in determining pattern of relationship among the cost determinants and variables. The factors were ranked in order of their degree of severity. It was discovered from the findings that, these factors are the major ones that results in cost overrun on construction sites.

(i).Inadequate planning (ii) Contractors project inexperience (iii) Inflation (iv) Incessant  variation order (v) Change in project design (vi) Project complexity (vii) shortening of contract period and (viii) Fraudulent practices.

In order to prevent occurrence of cost overrun or a practice action towards prevention of such, the following are recommended.

(i)inadequate planning:  breaking of project planning into short term achievable goals, medium term planning and Long term planning ( ii)Studying of project history for possible application on another similar projects  (iii) Bulk purchase of material  (iv)Proper design of the project during design stage so as to avoid. Undue on-project variation (v) Establishing fraudulent detecting system or system of individual accountability to discourage pilfering, stealing and other related vices.

STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN NIGERIAN CONSTRUCTION SITES

Share This

Details

Type Project
Department Building
Project ID BLD0007
Price ₦3,000 ($20)
Chapters 5 Chapters
No of Pages 50 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Building
    Project ID BLD0007
    Price ₦3,000 ($20)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    Chapter one Introduction 1.1. Background of the Study Construction industry has complexity in its nature because it contains a large number of parties such as clients, contractors, consultants, stakeholders, shareholders, regulators and others. Construction projects in the Gaza Strip suffer from many problems and complex issues in performance,... Continue Reading
    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contract. Fu and Drew (2002) suggest that competitive tendering is the most common method used for contractor selection. In competitive tendering process, a... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    THE EFFECT OF MOTIVATION OF LABOUR COST AND PRODUCTIVITY ON NIGERIA CONSTRUCTION INDUSTRY ABSTRACT Motivation is considered as an important tool for enhancing worker’ productivity. Construction sector is not an exception. It has been empirically established that motivation has positive impact on construction worker’s productivity. Moreover,... Continue Reading
    ABSTRACT The management of people at work is an integral part of the management process. The aim of this research is to evaluate the motivational factors of employee consultants in the Nigerian construction industry, with a view to improve motivational practices which leads to growth and sustenance of the Nigerian construction industry. The... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Choice Of Station CHAPTER TWO... Continue Reading