+234 813 0686 500
+234 809 3423 853
info@grossarchive.com

Energy Audit, Optimisation and Management of Liquified Natural Gas Plants With Renewable Energy Resources Around the Plant: A Case Study of Brass LNG Limited, Brass Island, Nigeria

  • Type:Project
  • Pages:33
  • Format:Microsoft Word
(Mechanical Engineering Project Topics & Materials)

An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on techno-economic analysis was made for a wind-solar- gas turbine hybrid power system and results showed it's cheaper, environmentally friend, and more efficient and sustainable running a hybrid power system incorporating  wind and solar energy systems to power the Brass LNG facility as  well as the entire Brass Island community than running on gas turbines and diesel powered generators alone. The unit cost of electricity was much less than that of grid electricity. 

Energy Audit, Optimisation and Management of Liquified Natural Gas Plants With Renewable Energy Resources Around the Plant: A Case Study of Brass LNG Limited, Brass Island, Nigeria

Share This

Details

Type Project
Department Mechanical Engineering
Project ID MCE0203
Price ₦3,000 ($9)
No of Pages 33 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Mechanical Engineering
    Project ID MCE0203
    Price ₦3,000 ($9)
    No of Pages 33 Pages
    Format Microsoft Word

    Related Works

    An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
    The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
    Table of Contents 1. Introduction 2. Electricity Demand 3. Wind Power System 4. Floating Solar Photovoltaic (PV) System 5. Electricity Storage Systems ____ 6. Site Choice 7. Planning Permission Statement 8. Environmental Impact Assessment _ 9. Project Plan 10.... Continue Reading
    ABSTRACT 1956 oil was first struck in commercial qualities in Oloibiri in the present day Ogbia Local Government Area of Bayelsa State. Accordingly, the discovery of oil has brought economic prospect to the nation and... Continue Reading
    INTRODUCTION One of the many problems facing the business community has been the problem of integrating the objectives of the employees with that of the organization for the achievement of the organization objectives. Even when such integration has been made there should be a dear method or system of measurement of the contribution of employees to... Continue Reading
    INTRODUCTION One of the many problems facing the business community has been the problem of integrating the objectives of the employees with that of the organization for the achievement of the organization objectives. Even when such integration has been made there should be a dear method or system of measurement of the contribution of employees to... Continue Reading
    INTRODUCTION One of the many problem facing the business community has been the problem of integrating the objectives of the employees with that of the organization for the achievement of the organization objectives. Even when such an integration has been made there should be a dear method or system of measurement of the contribution of employees... Continue Reading
    Abstract The study focused on the effect of energy consumption and environmental degradation on economic growth in Nigeria. The empirical analysis that was carried out to achieve the objectives mentioned above were diagnostic tests such as unit root, co-integration, Error Correction Model (ECM) and ordinary least square (OLS) which aimed at... Continue Reading
    ABSTRACT The concept of Superconductors in relation to energy gap was considered in this study. The occurrence of the Meissner effect indicates that superconductivity cannot be understood simply as the idealization of perfect conductivity in classical physics . The major aim of this project is to study the concept of energy gap in super conductors... Continue Reading
    ABSTRACT The aim of the study is to unveil the impact of Working Capital Management on a company’s profitability using Lovonus Trust and Investment Limited as the case study of the research work. The research questions include: What is the significance of Working Capital Management to Lovonus Trust and Investment; should receivables be allowed... Continue Reading