CONSTRUCTION OF A SCREW CONVEYOR WITH A SINGLE PHASE ELECTRIC MOTOR

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0167
  • Access Fee: ₦5,000 ($14)
  • Pages: 35 Pages
  • Format: Microsoft Word
  • Views: 813
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
In the society at large Technology is fast replacing the crude method of carrying out work and has been making room for employment. Besides, it has also caught the attention of the youths who will prefer to work in a company with technological operations than one with man-power operations. This project can be used to convey materials ranging from those in powdery forms grit forms, and stones in the size of crushed granites. If applied to the foundry technology practical (sand mould) under gone by the department. The lecture will experience ease in carrying out his lecture as well as satisfaction since there would not be lack of sand as this can be seen to, by an attendant and the lectures will have all the student of the Department in attendance.  
TABLE OF CONTENT
Title page ii
Little of transmittal iii
Release iv
Signature v
Approval vi
Dedication vii
Acknowledgement viii
Table of content ix
Abstract xi
CHAPTER ONE
1.1 Introductions 1
1.2 Description of the screw conveyor 2

CHAPTER TWO
 2.1 Mode of operation 4
2.2 Material selections 6

CHAPTER THREE 
3.1 design 7
3.2 design analysis 7
3.3 principle of operation 9
3.4 capacity of the screw conveyor 10
3.5 sequence of operation/ construction 11

CHAPTER FOUR
4.1 assembling of the conveyor 37
4.2 cost analysis 38

CHAPTER FIVE
5.1 conclusions 41
5.2 recommendations 41
5.3 references     42
 




 

CONSTRUCTION OF A SCREW CONVEYOR WITH A SINGLE PHASE ELECTRIC MOTOR
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0167
  • Access Fee: ₦5,000 ($14)
  • Pages: 35 Pages
  • Format: Microsoft Word
  • Views: 813
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Mechanical Engineering
    Project ID MCE0167
    Fee ₦5,000 ($14)
    No of Pages 35 Pages
    Format Microsoft Word

    Related Works

    CONSTRUCTION OF A SCREW CONVEYOR WITH A SINGLE PHASE ELECTRIC MOTOR TABLE OF CONTENT CHAPTER ONE 1.1 Introductions 1.2 Description of the screw conveyor CHAPTER TWO 2.1 Mode of operation 2.2 Material selections CHAPTER THREE 3.1 design 3.2 design analysis 3.3 principle of operation 3.4 capacity of the screw conveyor 3.5 sequence of operation/... Continue Reading
    The energy sector plays a major role in driving Kenya’s economy. The need to conceive, develop and sustain energy generating sources cannot be underestimated.   Being a growing economy, Kenya therefore needs to redirect her effort in production of self-sustaining energy generating sources. It is in this line that the government through the... Continue Reading
    The energy sector plays a major role in driving Kenya’s economy. The need to conceive, develop and sustain energy generating sources cannot be underestimated.   Being a growing economy, Kenya therefore needs to redirect her effort in production of self-sustaining energy generating sources. It is in this line that the government through the... Continue Reading
     ABSTRACT  The construction of a 3-phase motor operation indicator exposes the techniques and skills employed in the construction of complex electrical circuit. The combination of contactors overload relay and other component to achieved the desired goal is diagrammatically and descriptively treated of practical knowledge     TABLE OF CONTENTS... Continue Reading
     ABSTRACT  The construction of a 3-phase motor operation indicator exposes the techniques and skills employed in the construction of complex electrical circuit. The combination of contactors overload relay and other component to achieved the desired goal is diagrammatically and descriptively treated of practical knowledge     TABLE OF CONTENTS... Continue Reading
    ABSTRACT With the rapid growth in the rate of acquisition of Three Phase Motor both for home, office or business uses, there is need to consider the type of motor that is needed and acquired for various uses or purpose. This project explain how individual, organization can assemble a complete motor, emphasis is based on the construction of 3hp... Continue Reading
    ABSTRACT This is a technical project write-up design and construction were carried out by me with deep intensive and extensive research work. I all give credit to the authors of the textbooks whose I referred to in the cause of writing this project and its subsequent design and construction. In this project, I shed light on the basic principle of... Continue Reading
    ABSTRACT This is a technical project write-up design and construction were carried out by me with deep intensive and extensive research work under the strict supervisor of Engr K.C Ugwu.  I all give credit to the authors of the textbooks whose I referred to in the cause of writing this project and its subsequent design and construction. In this... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us