+234 813 0686 500
+234 809 3423 853
info@grossarchive.com

DESIGNING OF A WIND TURBINE USING WIND ENERGY POTENTIAL, A CASE OF FUTA

  • Type:Project
  • Pages:92
  • Format:Microsoft Word
(Construction Management Project Topics & Materials)

In this study of designing a wind turbine using wind energy potential, a case of FUTA. Weibull distribution function method was adopt with the help of probability density function and cumulative density function analysis, the wind speed characteristics and energy potential of the study area was investigated using hourly wind speed data that span between 1 and 12 months (1year) and measured at a height of 10 m. Hellmann power law was used to derive the wind characteristics of the study area to 20m, 30m, 40m, 50m, and 60m heights respectively. The data was analyzed and plotted using R-studio and Microsoft Excel. It was shown that the monthly mean wind speed at the 10m height original data collected are 1.8m/s, 1.13m/s, 1.12m/s, 1.3m/s, 1.47m/s, 1.49m/s, 1.79m/s, 1.80m/s, 1.44m/s, 1.40m/s, 1.58m/s, respectively. The type of wind turbine that can work perfectly in the study area was determined which is “AVANTIS-927”. According to this research the performance of this selected wind turbine models on monthly basis would be able to produce rated power between (3Kw to 50Kw) at a varying height, i.e. depending on the height of the tower because the higher the turbine tower the more efficient the turbine to produce power. 


TABLE OF CONTENTS 

Certification                     i 

Dedication                               ii

 Acknowledgement                   iii 

Abstract                               iv 

Table of                               v 

List of Tables                                  vi 

List of Figures                              vii 

CHAPTER ONE 

1.0  Introduction                    1-3 

1.1  Site selection for a wind turbine                3-4

 1.2  Statement of problem                  4

 1.3  Justification of the study                  5 

1.4  Research questions                    5 

1.5  Aim and objectives                    5

 1.5.1  Aim                        5 

1.5.2  Objective                      5 

CHAPTER TWO

2.0  Literature review                   6 - 11 

2.1  Wind turbine                     11 – 12 

2.1.1  Advantages of wind turbine                  12 – 13

 2.1.2  Disadvantages of wind turbine                13 – 14 

2.1.3  Types of wind turbine                  15 – 20

 2.2  Design of wind turbine                  20 – 22 

2.3  Aerodynamic of wind turbine               22 

2.3.1  Power coefficient and Betz’s law               22 

2.3.2  Lift and drag force                    23  

CHAPTER THREE 

3.0  Study area                    24

 3.1  Location                    24-25 

3.2  Data and Methodology                 26 

3.2.1  Data                        26 

3.2.2  Methodology                     26 – 28 

3.2.2.2 Determination of Weibull parameter              28 – 29 

3.2.2.3      Mean wind power density and energy density           29  

3.2.2.4      Wind profile                    30-31 

3.2.2.5     Mean wind speed variance                31  

CHAPTER FOUR   4.0  Result and discussion                 32 

4.1  Weibull Probability Density function and cumulative Density function     40

 4.1.1  Probability Density function                  40 – 43 

4.1.2  Cumulative Density function                44 – 50 

4.2  Time series analyses                   51 

4.2.1  Daily mean wind speed (time series)               51 

4.2.2  Daily mean wind speed (flow chart)                52 

4.3  Mean wind speed and variances                53 

4.4  Most probable wind speed and wind speed carrying maximum energy      53 - 57 

4.5  Wind power density and energy density at all height           57 - 59 

4.6  Annual mean wind and mean power density             69 - 62 

4.7  Analyses of wind speed and Weibull parameters              (k-shape factor and c-scale factor)                62 – 66 

4.8  Wind turbine power output                   67 – 68 

CHAPTER FIVE 

5.0  Conclusion and Recommendation                69

 5.1  Conclusion                     69 - 70 

5.2  Recommendation                    71 

References                      72 - 77

DESIGNING OF A WIND TURBINE USING WIND ENERGY POTENTIAL, A CASE OF FUTA

Share This

Details

Type Project
Department Construction Management
Project ID CMG0003
Price ₦3,000 ($9)
No of Pages 92 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Construction Management
    Project ID CMG0003
    Price ₦3,000 ($9)
    No of Pages 92 Pages
    Format Microsoft Word

    Related Works

    In this study of designing a wind turbine using wind energy potential, a case of FUTA. Weibull distribution function method was adopt with the help of probability density function and cumulative density function analysis, the wind speed characteristics and energy potential of the study area was investigated using hourly wind speed data that span... Continue Reading
    MOBILE PUBLICITY USING A VANE ON A MECHANISM WITH FOUR CARDINAL POINTS FOR THE USE OF WIND VANE TO SHOW WHICH WAY THE WIND IS BLOWING, ALSO TO PUBLICIZE SCULPTURE GARDEN. PREFACE The main purpose of executing this project – The Wind Vane is to combine the scientific and Artistic approach in the construction/installation of the vane. The Artists... Continue Reading
    There is a crucial need in the mainland regions of Nigeria to enhance the development of wind technology and engineering, which is essential for the designing of Wind Energy Conversion Systems (WECS). The Weibull Probability Density Function (PDF) with two parameters is widely accepted and commonly utilized for modelling, characterizing and... Continue Reading
    The aim of the project is to design a renewable energy system that can meet the current and projected electricity demands for the island of Great Cumbrae. This should be achieved by providing a stable electricity output and the meet the calculated total annual base load supply of 11.29 GWh. In addition to providing a stable supply of electricity,... Continue Reading
    ABSTRACT This project is aimed at designing and implementing a transacting system or an ATM machine for Eco Bank Plc, Obosi Onicha. Specially, this study covered the activities of financial institutions in mobilizing cash payments and given the larger part of it to customers who wish to do their cash transactions electronically in Eco bank Obosi... Continue Reading
    ABSTRACT The Turbine Mixer was Fabricated at the Mechanical Engineering Workshop of Institute of Management and Technology, Enugu. The method of the fabrication of the turbine mixer involved a preliminary computation of the dimensions of the standard turbine in relation to the dimension of the reacting vessel in which... Continue Reading
    ABSTRACT The Turbine Mixer was Fabricated at the ________________________ The method of the fabrication of the Turbine Mixer involves a preliminary computation of the dimensions of the standard Turbine in relation to the dimension of the reacting vessel in which they will be used in. making out, cutting out to sizes, rolling/folding, welding, body... Continue Reading
    ABSTRACT The Turbine Mixer was Fabricated at the Mechanical Engineering Workshop of Institute of Management and Technology, Enugu. The method of the fabrication of the turbine mixer involved a preliminary computation of the dimensions of the standard turbine in relation to the dimension of the reacting vessel in which... Continue Reading
                The lack of knowledge of the availability of some drugs in hospitals can affect the treatment of patients in hospitals. The hospital inventory management system is a system that maintains inventories of drugs, hospital accounting. It is stored in the system database, which helps the Hospital management, Staff, Doctors and... Continue Reading