+234 813 0686 500
+234 809 3423 853
info@grossarchive.com

DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR

  • Type:Project
  • Pages:51
  • Format:Microsoft Word
(Electrical Engineering Project Topics & Materials)
Abstract
As the growing population of human race widens the gulf between energy supply and energy demand, the imbalance in energy availability sent researchers into excavating for a way of settling this age long squabble. A lasting solution is vested on alternative use of the renewable energy source, a project that is yet to be widely applied. Hence, the continuation of the unsettled yearns for sufficient power. Consequently, the power lines are frequently over loaded resulting to a trip of power by the action of switch gears or by the load shading process undertaken by the distribution authorities.

DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR

Share This

Details

Type Project
Department Electrical Engineering
Project ID ELE0178
Price ₦3,000 ($9)
No of Pages 51 Pages
Format Microsoft Word

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0178
    Price ₦3,000 ($9)
    No of Pages 51 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector. In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Phase Selector.           In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing the argument necessary for a thorough... Continue Reading
    ABSTRACT This is a technical report presented on the design and construction of an Automatic Three Phase Selector.         In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing the argument necessary for a thorough... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT With the rapid growth in the rate of acquisition of Three Phase Motor both for home, office or business uses, there is need to consider the type of motor that is needed and acquired for various uses or purpose. This project explain how individual, organization can assemble a complete motor, emphasis is based on the construction of 3hp... Continue Reading