ELECTRICAL POWER DISTRIBUTION INFORMATION SYSTEM

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0653
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ELECTRICAL POWER DISTRIBUTION INFORMATION SYSTEM

CHAPTER ONE

GENERAL INTRODUCTION

1.1                      INTRODUCTION

The importance of electricity in the higher institutions of learning cannot be overemphasized. However, Electrical Power Generation in many universities in Nigeria is self generated by the institutions as the inadequate national power supply by the countries’ power generation company is insufficient to handle the electrical needs of the institution. To this end power generating plants are purchased and utilized in these institutions for the purpose of generating electric power.

A power plant is an industrial facility for the generation of electric power. At the center of nearly all power stations is a generator, a rotating machine that converts mechanical power into electrical power by creating relative motion between a magnetic field and a conductor. The energy source harnessed to turn the generator varies widely. It depends chiefly on which fuels are easily available, cheap enough and on the types of technology that the power company has access to. The  power plants are used in the universities for supplying electrical power to their buildings and infrastructures such as the academic blocks where the lectures halls exists, the administrative quarters, where the offices of the school staff are located and the hostel blocks where the students are accommodated.

1.3     STATEMENT OF THE PROBLEM

The problems associated with providing power to the various infrastructures in the universities through the power generating plants are outlined below:

Poor Rationing: Due to efforts made by most institutions to minimize the monetary resources available for the management of the school affairs, the electric power supply is rationed amongst the various building infrastructures available in the university premises. Most often this is done with out a well defined rationing plan which amounts to some infrastructure getting more power supply than others.

Fuel Expenses: There are universities which, due to their intention to keep up with the high standards of the educational services they promise to offer, pay for the power plants to be run for the entire various infrastructures in the school. This amounts to the spending of excess funds to run the institutions.

1.3     AIMS AND OBJECTIVES

The aim of this research project is to design and implement a database of electrical power distribution in a university community for control of the power plant distribution grid in order to efficiently and adequately supply the needed power to the appropriate units in the institutions as at when due. The following objectives to be achieved after the completion of this project are outlined below:

·        Provide a Database Driven Information System that be used to provide information for the Power Plant Grid operators so as to create a schedule which will be used to ration the power supply amongst the various infrastructure available in the institution.

·        Identify the various infrastructures available in the school and make room for the newly proposed system to include newly built infrastructure to the system database.

·        Implement a system that will allow for the setting and adjustments of the priority given to each building in the school based on factors such as the time of the activities done in the buildings and the days of the week.

1.4     SIGNIFICANCE OF THE STUDY

The successful implementation of this research project will ensure that the higher institutions of learning will enjoy the benefits of having electric power supply through the efficient regulation of electricity to the various building infrastructure available in the universities. Excessive money spending will be curtailed as limited resources will be utilized effectively.

1.5            SCOPE AND LIMITATION

The scope of this project will cover the development and design of a database driven electrical power distribution information system to be utilized by the operators of the power plant grid supplying electricity to the university community.

Inasmuch as this project is intended for use in institutions of higher learning in the country, this focus of this research will be limited only to BSU University.

1.6    RESEARCH METHODOLOGY

The source of data to be used for this work will come from the internet, libraries and public journals.

1.7     DEFINITION OF TERMS

Electricity: Electricity is the science, engineering, technology and physical phenomena associated with the presence and flow of electric charges. Electricity gives a wide variety of well-known electrical effects, such as lightning, static electricity, electromagnetic induction and the flow of electrical current in an electrical wire. In addition, electricity permits the creation and reception of electromagnetic radiation such as radio waves.

Electric Grid:  An electrical grid is an interconnected network for delivering electricity from suppliers to consumers. It consists of three main components: 1) power stations that produce electricity from combustible fuels (coal, natural gas, biomass) or non-combustible fuels (wind, solar, nuclear, hydro power); 2) transmission lines that carry electricity from power plants to demand centers; and 3) transformers that reduce voltage so distribution lines carry power for final delivery.

Smart Grid:  A smart grid is an electrical grid that uses computers and other technology to gather and act on information, such as information about the behaviors of suppliers and consumers, in an automated fashion to improve the efficiency, reliability, economics, and sustainability of the production and distribution of electricity.

ELECTRICAL POWER DISTRIBUTION INFORMATION SYSTEM
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0653
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Computer Science
    Project ID CPU0653
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 65 Pages
    Format Microsoft Word

    Related Works

    CHAPTER ONE GENERAL INTRODUCTION Introduction This chapter presents the introduction to the study. It presents that theoretical background, statement of the problem, aim and objectives of the study, significance of the study, scope of the study, organization of the research and definition of terms. The use of computer (information technology) in... Continue Reading
    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
      TABLE OF CONTENTS DECLARATION    i DEDICATION    ii COPYRIGHT    iii ACKNOWLEDGEMENTS    iv ABSTRACT    v LIST OF TABLES    vii LIST OF FIGURES    viii LIST OF ACCRONYMS AND ABBREVIATIONS    ix OPERATIONAL DEFINITION OF TERMS    x INTRODUCTION    1 1.0 Background of the Study    1 1.2 Solar Power System    2... Continue Reading
      TABLE OF CONTENTS DECLARATION i DEDICATION ii COPYRIGHT iii ACKNOWLEDGEMENTS iv ABSTRACT v LIST OF TABLES vii LIST OF FIGURES viii LIST OF ACCRONYMS AND ABBREVIATIONS ix OPERATIONAL DEFINITION OF TERMS x INTRODUCTION 1 1.0 Background of the Study 1 1.2 Solar Power System 2 1.3 Operating Principle of the DSTATCOM 3 1.4. Modelling of PV Array 5... Continue Reading
    ABSTRACT Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically... Continue Reading
    ABSTRACT Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically... Continue Reading
    ABSTRACT This report is on stability study in electrical power system. The ability of an electric power system to reestablish the initial state (or one practically identical) after any disturbance manifested as a deviation from the initial parameter values for the system’s operation. The electric power sources in a power system are usually... Continue Reading
    ABSTRACT This project work is aimed at developing an efficient Algorithm for the management of Electric Power network using fuzzy logic. The fuzzy logic model functions as a system operator in making decision for load shedding and transfer switching. The new technique uses the system data frequency variation, load variation and voltage variation... Continue Reading
    The major components of a gas turbine are compressor, combustors, turbine and generator. It operates by continuous drawing in fresh air into the compressor. The Air is then compressed to a high pressure in the compressor and discharge into the combustion. Here the air is missed with gas and burns continuous once ignited to increase its energy... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us